Early access is open. Bring one real project and we will build its breakdown, vocabulary and workflow live in the session. Request a demo →

Throw the switch
A vessel in dry dock during fit-out, staging erected and work lighting rigged.

Marine · Vocabulary configured

Hulls and blocks.Weld NDT to sea trials.

A hull is a tree, a block is a branch, and a bulkhead weld is an item with an inspection attached to it. Nothing about the engine had to change to say so.

Records on this shape

1,600

Generated automatically on registration

Stages
FABRICATED ERECTED OUTFITTED TESTED COMMISSIONED
Destination MARINE
Level 1 HULL
Level 2 BLOCK
Item COMPONENT
Record INSPECTION
Stage STAGE
01 · What it is

Project management with a full audit trail for every item, in one place.

Cairn OS is for work that has to be proven, not just reported. A project is broken down into every individual item it contains. Each item carries the records that prove it reached each stage, and each record carries who signed it and when.

The engine holds no vocabulary of its own. You define what your levels, items, records and stages are called, and every screen, dashboard and export uses your words. That is how one system fits any project shape without being rebuilt for it, and how progress, sign-off and traceability end up in one place rather than three.

In plain words
Item
The smallest thing you track. You decide what it is and what it is called.
Record
The form that proves an item reached a stage. You define its fields and its rules.
Stage
How far along an item is. You define the sequence, and what each stage holds shut.
Roll-up
Completion added up from single items to the whole project, recomputed as records are signed.
Audit trail
Every record, signature and revision, kept immutably and queryable.
02 · The register

Column positions never move. Only what the headers say.

That is the whole argument. Change the vocabulary and every screen, dashboard and export follows, because the shape of the data never depended on the words in the first place.

Live register of tracked items, their records and current status. The column headings change with the project language configured for the project.
Component Component Type Block Hull Inspection Stage Status
ME-01 MAIN ENGINE BLOCK 41 ENGINE RM HULL 812 IR-22 ALIGNMENT OUTFITTED VERIFIED
BW-P-02 BALLAST PUMP BLOCK 38 PUMP RM HULL 812 IR-14 PRESSURE TESTED SIGNED
SWB-MAIN SWITCHBOARD BLOCK 41 ENGINE RM HULL 812 IR-31 MEGGER OUTFITTED IN PROGRESS
BHD-118-P BULKHEAD BLOCK 22 FWD HULL 812 IR-03 WELD NDT ERECTED ISSUE
STG-04 STEERING GEAR BLOCK 52 AFT HULL 812 IR-27 FUNCTION TESTED IN PROGRESS
FW-TK-03 TANK BLOCK 30 MID HULL 812 IR-09 HYDRO ERECTED SIGNED

Demonstration data · in marine vocabulary

What this shape gives you

Defects, not punch items

Inspections, not ITRs

Roll-up per block to the hull

See it on your own project's shape.

Bring one real marine project. In one session we build its breakdown, its vocabulary and its workflow live, and you watch a tag go from registered to signed with the dashboard moving behind it.

Request a demo →

No seats to count during early access · trycairn@cairn-os.com