Early access is open. Bring one real project and we will build its breakdown, vocabulary and workflow live in the session. Request a demo →

Throw the switch
A film studio during rigging, crew silhouetted beneath a large overhead soft light.

TV production · Vocabulary configured

Episodes and blocks.Built, dressed, rigged, struck.

Taken verbatim from a real sample project. If a completions engine can track a standing set from build to strike without a line of new code, the industry-agnostic claim is not marketing.

Records on this shape

1,920

Generated automatically on registration

Segments
BUILT DRESSED RIGGED TESTED SHOT STRUCK
Destination TV PRODUCTION
Level 1 EPISODE
Level 2 SHOOTING BLOCK
Item SCENE
Record CHECKLIST
Stage SEGMENT
01 · What it is

Project management with a full audit trail for every item, in one place.

Cairn OS is for work that has to be proven, not just reported. A project is broken down into every individual item it contains. Each item carries the records that prove it reached each stage, and each record carries who signed it and when.

The engine holds no vocabulary of its own. You define what your levels, items, records and stages are called, and every screen, dashboard and export uses your words. That is how one system fits any project shape without being rebuilt for it, and how progress, sign-off and traceability end up in one place rather than three.

In plain words
Item
The smallest thing you track. You decide what it is and what it is called.
Record
The form that proves an item reached a stage. You define its fields and its rules.
Stage
How far along an item is. You define the sequence, and what each stage holds shut.
Roll-up
Completion added up from single items to the whole project, recomputed as records are signed.
Audit trail
Every record, signature and revision, kept immutably and queryable.
02 · The register

Column positions never move. Only what the headers say.

That is the whole argument. Change the vocabulary and every screen, dashboard and export follows, because the shape of the data never depended on the words in the first place.

Live register of tracked items, their records and current status. The column headings change with the project language configured for the project.
Scene Scene Type Shooting Block Episode Checklist Segment Status
SC-412-INT INTERIOR STANDING BLOCK B EPISODE 4 CL-03 RIG SAFETY RIGGED SIGNED
SC-418-EXT EXTERIOR BUILD BLOCK B EPISODE 4 CL-07 STRUCTURAL BUILT IN PROGRESS
SC-402-INT INTERIOR STANDING BLOCK A EPISODE 4 CL-11 TEMP ELEC TESTED VERIFIED
SC-421-SFX EFFECTS SET BLOCK B EPISODE 4 CL-14 SFX SIGN-OFF DRESSED ISSUE
SC-407-INT INTERIOR SWING BLOCK A EPISODE 4 CL-02 DRESSING DRESSED OPEN
SC-430-LOC LOCATION SET BLOCK C EPISODE 5 CL-09 ACCESS BUILT IN PROGRESS

Demonstration data · in tv production vocabulary

What this shape gives you

Scenes, not tags

Notes, not snags

Segments, not stages

See it on your own project's shape.

Bring one real tv project. In one session we build its breakdown, its vocabulary and its workflow live, and you watch a tag go from registered to signed with the dashboard moving behind it.

Request a demo →

No seats to count during early access · trycairn@cairn-os.com